top of page

Tempus Residential Estate

MUDGEERABA | COMPLETED DECEMBER 2020

Construction of 83 townhouses, with four bed, two cars and a communal BBQ / pool area, including external works and landscaping.

Client: Alvey Group

Ombre’ Robina

ROBINA | UNDER CONSTRUCTION

The project on an elevated site in Robina, located at 46 Scottsdale Drive, features 95 one, two and three-bedroom apartments. Eight level building with 2 basements, featuring private resident amenities, integrated commercial spaces, with a high level of architectural design and interiors.

Client: Immerse Projects

Capri Residences

ISLE OF CAPRI | UNDER CONSTRUCTION

48 two and three storey Luxury villas surrounding central resort style garden amenities including associated civil works.

Client: Monaco Property Group

Si Bilinga

BILINGA | UNDER CONSTRUCTION

Completion of 15 partially completed Luxury beachfront units over 9 levels plus 2 basements following liquidation of the original builder.

Client: IDS Property

Rhythm Kirra Hill

COOLANGATTA | UNDER CONSTRUCTION

40 Beachside Apartments spread over 8 levels plus 2 basements. Communal area including rooftop pool, BBQ area, gym, sauna and meeting/media room.

Client: Immerse Projects

Robina Grand

ROBINA | COMPLETED NOVEMBER 2023

69 Apartments over 8 levels plus 2 basements and 4 townhouses. Communal areas including swimming pool, gym, yoga room, lounge areas and games room.

Client: VLine Developments

Armida

ROCHEDALE | COMPLETED APRIL 2024

Construction of 49 multi-level 4-bedroom townhomes including civil works. Communal facilities including swimming pool, BBQ facilities and gym.

Client: Long Ze

The Strand

HOPE ISLAND | COMPLETED OCTOBER 2023

Construction of 20 Hampton inspired townhouses including communal BBQ and pool facilities.

Client: The Kasa Group

Lyra South

HOPE ISLAND | COMPLETED JANUARY 2023

60 double townhouse gated community, separated into 13 blocks. Communal area with basketball court and BBQ facilities. All fully landscaped.

Client: Changfa Group

The Hansford Residences

COOMBABAH | COMPLETED DECEMBER 2019

Construction of 58 three and four bedroom townhouses with a communal BBQ / pool area. Including external works and landscaping.

Client: Devlink Group

Artisan Terraces

MUDGEERABA | COMPLETED FEBRUARY 2019

Construction of 68 two storey townhouses with pool and BBQ amenities, including external works and landscaping.

Client: Alvey Group

Eureka Wynnum

WYNNUM | COMPLETED JANUARY 2022

Redevelopment of existing retirement village adding an additional 22 self-contained units separated into 2 single level and 1 double storey building with lift and extension of existing community building.

Client: Eureka Villages

Oro Apartments

LABRADOR | COMPLETED FEBRUARY 2019

Construction of a 6 level boutique apartment building with one unit per floor. Each unit consisting of 3 bedrooms and 3 bathrooms with the exception of the upper level being a 1 bedroom custom sub penthouse unit.

Client: Ian Campbell

Serenity Green

HELENSVALE | COMPLETED NOVEMBER 2022

Construction of 60 Steel framed double storey townhouses including all civil, earth and roadworks. All landscaped and communal facilities and pool provided.

Client: Keylin Group

Mode Apartments

WINDSOR | COMPLETED DECEMBER 2016

2 side by side, 4 storey apartment complexes consisting of 59 one and two bedroom apartments with landscaped rooftop terraces and BBQ facilities.

Client: Eddie Fung

Lions Haven

Nursing Home

HOPE ISLAND

Extension of existing nursing home facilities to create additional 54 bed multi storey complex including ensuite and outside patio / balcony area for each room.

Commercial and Medical Precinct

PACIFIC PINES

Construction of a health, medical and retail services centre in the commercial hub of Pacific Pines.

The Clarence Residences

UPPER COOMERA | COMPLETED JULY 2021

36 double storey townhouses separated into 8 clusters. Communal area with pool and BBQ facilities. All fully landscaped.

Client: BOS Property

Park Cove

Eastern Villas

HOPE ISLAND | COMPLETED APRIL 2020

Fully gated 36 townhouse construction project on a long narrow block with 6 fronting the canal system. All services, civils, boardwalk, landscaping, pool, roads and external works.

Client: Keylin Group

7-Eleven

NORTH LAKES

Construction of 197sqm 7-Eleven Service Station, 158sqm restaurant & 207sqm carwash. Development build included metal Roof, roller shutters, clear glazing panels, eaves gutter, metal cladding, fuel canopy, awning & aluminium battens. There is car parking for 31 vehicles as well as associated landscaping areas.

Park Cove

Villas

HOPE ISLAND | COMPLETED APRIL 2019

44 double storey townhouse project within a gated community. All civil, roadworks, community areas included in works.

Client: Keylin Group

Welch Street

SOUTHPORT

Construction of a two level carpark and three level office building.

Park Cove Terraces

HOPE ISLAND | COMPLETED AUGUST 2018

39 three storey townhouses including all landscaping and external works. Delivered in 2 separate stages.

Client: Keylin Group

Clover Hill Terraces

MUDGEERABA | COMPLETED NOVEMBER 2016

56 three and four bedroom townhouses each with 2 car spaces including communal pool and BBQ area. Completed in 3 separate stages.

Client: Alvey Group

Greville Terraces

WOOLOOWIN | UNDER CONSTRUCTION

A collection of terrace homes with communal swimming pool and recreation area all fully landscaped.

Client: Cedar Woods

Minnippi Quarter

CARINA | COMPLETED NOVEMBER 2022

Completion of 66 partially completed Townhouses and associated site works following liquidation of the original Builder.

Client: Frasers Property Group

CONTACT OUR TEAM TO DISCUSS

YOUR NEXT CONSTRUCTION PROJECT

Palladium, Hope Island

Palladium

HOPE ISLAND | COMPLETED JULY 2021

39 double lock up townhouses, including 20 canal facing, on a triangular block with only one entry/exit point. Roads, services, and pool community areas.

Client: Keylin Group

bottom of page