Palladium, Hope Island

Palladium

HOPE ISLAND | COMPLETED JULY 2021

39 double lock up townhouses, including 20 canal facing, on a triangular block with only one entry/exit point. Roads, services, and pool community areas.

Client: Keylin Group

Tempus Residential Estate

MUDGEERABA | COMPLETED DECEMBER 2020

Construction of 83 townhouses, with four bed, two cars and a communal BBQ / pool area, including external works and landscaping.

Client: Alvey Group

The Hansford Residences

COOMBABAH | COMPLETED DECEMBER 2019

Construction of 58 three and four bedroom townhouses with a communal BBQ / pool area. Including external works and landscaping.

Client: Devlink Group

Artisan Terraces

MUDGEERABA | COMPLETED FEBRUARY 2019

Construction of 68 two storey townhouses with pool and BBQ amenities, including external works and landscaping.

Client: Alvey Group

Oro Apartments

LABRADOR | COMPLETED FEBRUARY 2019

Construction of a 6 level boutique apartment building with one unit per floor. Each unit consisting of 3 bedrooms and 3 bathrooms with the exception of the upper level being a 1 bedroom custom sub penthouse unit.

Client: Ian Campbell

Mode Apartments

WINDSOR | COMPLETED DECEMBER 2016

2 side by side, 4 storey apartment complexes consisting of 59 one and two bedroom apartments with landscaped rooftop terraces and BBQ facilities.

Client: Eddie Fung

Lions Haven

Nursing Home

HOPE ISLAND

Extension of existing nursing home facilities to create additional 54 bed multi storey complex including ensuite and outside patio / balcony area for each room.

Commercial and Medical Precinct

PACIFIC PINES

Construction of a health, medical and retail services centre in the commercial hub of Pacific Pines.

CONTACT OUR TEAM TO DISCUSS YOUR NEXT CONSTRUCTION PROJECT

Eureka Wynnum

WYNNUM | COMPLETED JANUARY 2022

Redevelopment of existing retirement village adding an additional 22 self-contained units separated into 2 single level and 1 double storey building with lift and extension of existing community building.

Client: Eureka Villages

The Clarence Residences

UPPER COOMERA | COMPLETED JULY 2021

36 double storey townhouses separated into 8 clusters. Communal area with pool and BBQ facilities. All fully landscaped.

Client: BOS Property

Park Cove

Eastern Villas

HOPE ISLAND | COMPLETED APRIL 2020

Fully gated 36 townhouse construction project on a long narrow block with 6 fronting the canal system. All services, civils, boardwalk, landscaping, pool, roads and external works.

Client: Keylin Group

7-Eleven

NORTH LAKES

Construction of 197sqm 7-Eleven Service Station, 158sqm restaurant & 207sqm carwash. Development build included metal Roof, roller shutters, clear glazing panels, eaves gutter, metal cladding, fuel canopy, awning & aluminium battens. There is car parking for 31 vehicles as well as associated landscaping areas.

Park Cove

Villas

HOPE ISLAND | COMPLETED APRIL 2019

44 double storey townhouse project within a gated community. All civil, roadworks, community areas included in works.

Client: Keylin Group

Welch Street

SOUTHPORT

Construction of a two level carpark and three level office building.

Park Cove Terraces

HOPE ISLAND | COMPLETED AUGUST 2018

39 three storey townhouses including all landscaping and external works. Delivered in 2 separate stages.

Client: Keylin Group

Clover Hill Terraces

MUDGEERABA | COMPLETED NOVEMBER 2016

56 three and four bedroom townhouses each with 2 car spaces including communal pool and BBQ area. Completed in 3 separate stages.

Client: Alvey Group