top of page
img4.jpg

Currumbin

CURRUMBIN WATERS | UNDER CONSTRUCTION

This is a multistage development in Currumbin Waters with this first stage comprising the construction of 30 3-storey townhouses including associated civil and landscaping works.

Client: LandCorp Development

EXT02_Eye-Level-View_C.jpg

Kaiya

KIRRA BEACH | Early Works Underway

Construction of an apartment building consisting of a diverse mix of 2, 3 & 4 bedroom apartments. The ground floor features a communal dining area and outdoor entertaining space.  Level 2 consists of a large 20-metre swimming pool, sauna, spa and cold plunge facilities. Additional amenities include alfresco BBQ and dining areas, gymnasium, dedicated work-from-home offices, and a communal meeting room.

Client: Immerse Projects
Website: www.kaiyakirrabeach.com.au

Harbour Shores Stage 1b

BIGGER WATERS | UNDER CONSTRUCTION

Stage 1B comprises 12 luxury waterfront townhouses all including their own plunge pools, one 5- storey apartment building including 60 apartments and a single level basement. Additionally, this stage includes the main communal recreational facilities for Harbour Shores which includes a large pool, tennis court, function and BBQ areas. The boutique unit development holds a 6-Star Green Star Communities v.1. rating.

Client: Lewis Land Group

1887_1.05_Exterior_Building_06_R008.jpg
EXTERIORHERO_approved.png

Bilinga House

BILINGA | UNDER CONSTRUCTION

Situated 200m from the beach this modern beachside project comprises 47 apartments over 10 levels, with 2 levels of basement. And features wellness facilities such as a pool, sauna, gym and BBQ entertaining area for residents..

Client: Centa Property Group

319_Gardener_Armida_S3_Cam01B_Exterior_final.jpg

Armida Stage 3

ROCHEDALE | Under Construction

The final stage of this development which includes 41 multi-level townhouses including civil works and landscaping. Communal facilities including swimming pool, BBQ facilities and gym.

Client: Long Ze

1887_1.04_Exterior_Park_R015.jpg

Harbour Shores Stage 1a

BIggera waters | UNDER CONSTRUCTION

Stage 1a comprises 6 luxury waterfront townhouses all including their own plunge pools, and one apartment building including a single level basement, 71 apartments and community pool. This boutique unit development holds a 6-Star Green Star Communities v1.1 rating.

Client: Lewis Land Group

Ombre’ Robina

ROBINA | Completed March 2026

The project on an elevated site in Robina, located at 46 Scottsdale Drive, features 95 one, two and three-bedroom apartments. Eight level building with 2 basements, featuring private resident amenities, integrated commercial spaces, with a high level of architectural design and interiors.

Client: Immerse Projects
Website: www.ombrerobina.com.au

Capri Residences

ISLE OF CAPRI | Completed December 2025

48 two and three storey Luxury villas surrounding central resort style garden amenities including associated civil works.

Client: Monaco Property Group

Si Bilinga

BILINGA | COMPLETED SEPTEMBER 2024

Completion of 15 partially completed Luxury beachfront units over 9 levels plus 2 basements following liquidation of the original builder.

Client: IDS Property

Rhythm Kirra Hill

COOLANGATTA | COMPLETED APRIL 2025

40 Beachside Apartments spread over 8 levels plus 2 basements. Communal area including rooftop pool, BBQ area, gym, sauna and meeting/media room.

Client: Immerse Projects

Robina Grand

ROBINA | COMPLETED NOVEMBER 2023

69 Apartments over 8 levels plus 2 basements and 4 townhouses. Communal areas including swimming pool, gym, yoga room, lounge areas and games room.

Client: VLine Developments

Greville Terraces

WOOLOOWIN | COMPLETED APRIL 2025

A collection of 37 terrace homes with communal swimming pool and recreation area all fully landscaped.

Client: Cedar Woods

Armida Stage 2

ROCHEDALE | COMPLETED APRIL 2024

Construction of 49 multi-level 4-bedroom townhomes including civil works. Communal facilities including swimming pool, BBQ facilities and gym.

Client: Long Ze

The Strand

HOPE ISLAND | COMPLETED OCTOBER 2023

Construction of 20 Hampton inspired townhouses including communal BBQ and pool facilities.

Client: The Kasa Group

Lyra South

HOPE ISLAND | COMPLETED JANUARY 2023

60 double townhouse gated community, separated into 13 blocks. Communal area with basketball court and BBQ facilities. All fully landscaped.

Client: Changfa Group

Minnippi Quarter

CARINA | COMPLETED NOVEMBER 2022

Completion of 66 partially completed Townhouses and associated site works following liquidation of the original Builder.

Client: Frasers Property Group

Serenity Green

HELENSVALE | COMPLETED NOVEMBER 2022

Construction of 60 Steel framed double storey townhouses including all civil, earth and roadworks. All landscaped and communal facilities and pool provided.

Client: Keylin Group

Eureka Wynnum

WYNNUM | COMPLETED JANUARY 2022

Redevelopment of existing retirement village adding an additional 22 self-contained units separated into 2 single level and 1 double storey building with lift and extension of existing community building.

Client: Eureka Villages

Palladium, Hope Island

Palladium

HOPE ISLAND | COMPLETED JULY 2021

39 double lock up townhouses, including 20 canal facing, on a triangular block with only one entry/exit point. Roads, services, and pool community areas.

Client: Keylin Group

Oro Apartments

LABRADOR | COMPLETED FEBRUARY 2019

Construction of a 6 level boutique apartment building with one unit per floor. Each unit consisting of 3 bedrooms and 3 bathrooms with the exception of the upper level being a 1 bedroom custom sub penthouse unit.

Client: Ian Campbell

The Clarence Residences

UPPER COOMERA | COMPLETED JULY 2021

36 double storey townhouses separated into 8 clusters. Communal area with pool and BBQ facilities. All fully landscaped.

Client: BOS Property

Mode Apartments

WINDSOR | COMPLETED DECEMBER 2016

2 side by side, 4 storey apartment complexes consisting of 59 one and two bedroom apartments with landscaped rooftop terraces and BBQ facilities.

Client: Eddie Fung

Tempus Residential Estate

MUDGEERABA | COMPLETED DECEMBER 2020

Construction of 83 townhouses, with four bed, two cars and a communal BBQ / pool area, including external works and landscaping.

Client: Immerse Projects

Lions Haven

Nursing Home

HOPE ISLAND

Extension of existing nursing home facilities to create additional 54 bed multi storey complex including ensuite and outside patio / balcony area for each room.

Park Cove

Eastern Villas

HOPE ISLAND | COMPLETED APRIL 2020

Fully gated 36 townhouse construction project on a long narrow block with 6 fronting the canal system. All services, civils, boardwalk, landscaping, pool, roads and external works.

Client: Keylin Group

7-Eleven

NORTH LAKES

Construction of 197sqm 7-Eleven Service Station, 158sqm restaurant & 207sqm carwash. Development build included metal Roof, roller shutters, clear glazing panels, eaves gutter, metal cladding, fuel canopy, awning & aluminium battens. There is car parking for 31 vehicles as well as associated landscaping areas.

The Hansford Residences

COOMBABAH | COMPLETED DECEMBER 2019

Construction of 58 three and four bedroom townhouses with a communal BBQ / pool area. Including external works and landscaping.

Client: Devlink Group

Commercial and Medical Precinct

PACIFIC PINES

Construction of a health, medical and retail services centre in the commercial hub of Pacific Pines.

Park Cove

Villas

HOPE ISLAND | COMPLETED APRIL 2019

44 double storey townhouse project within a gated community. All civil, roadworks, community areas included in works.

Client: Keylin Group

Welch Street

SOUTHPORT

Construction of a two level carpark and three level office building.

Artisan Terraces

MUDGEERABA | COMPLETED FEBRUARY 2019

Construction of 68 two storey townhouses with pool and BBQ amenities, including external works and landscaping.

Client: Immerse Projects

Park Cove Terraces

HOPE ISLAND | COMPLETED AUGUST 2018

39 three storey townhouses including all landscaping and external works. Delivered in 2 separate stages.

Client: Keylin Group

Clover Hill Terraces

MUDGEERABA | COMPLETED NOVEMBER 2016

56 three and four bedroom townhouses each with 2 car spaces including communal pool and BBQ area. Completed in 3 separate stages.

Client: Alvey Group

CONTACT OUR TEAM TO DISCUSS

YOUR NEXT CONSTRUCTION PROJECT

bottom of page